How we work
Phased, evidence-based and independent
Each phase has its own scope and terms, so our partners can stop, adjust or continue on the basis of what has been proven.
Phases
From first assessment to operation
Assess
Site, demand, grid and technology options; technical audits; a first view of feasibility.
Match
Qualified technology and partners selected for the project; commercial and supply terms structured.
Structure
Investment case, contracts, warranties and LTSA terms that investors and lenders accept.
Deliver
Integration management with local partners through installation, testing and commissioning.
Operate
EMS management, energy reports and performance follow-up.
Principles
- Technology-neutral: the project decides the equipment
- Owner-controlled: material decisions stay with the client
- Transparent: verified information is separated from assumptions
- Disclosed: material commercial relationships are declared
What we do not do
- Build plants or act as EPC
- Manufacture or resell equipment
- Assume the manufacturers’ equipment, performance or warranty obligations
- Commit a client to any supplier without its approval
- Give legal, tax or regulated investment advice